King George V School

The classrooms had not been renovated in over 30 years, and were identified for renovation in alignment with an international best practice approach to teaching spaces.

Related Insights

Retrofit

Lipman Building EnerPHit

The concept design was developed to Passive House EnerPHit standard, making it the largest EnerPHit project in the United Kingdom and the third largest in Europe at the time.

Retrofit

School of Law and Social Justice

The retrofit entailed the strip out and refurbishment of the existing building back to the concrete frame, internal shear walls, beams and upstands which were all retained and remediated.

Retrofit

Riverbank School

The base level refurbishment involved a basic upgrade to the MEP systems that had reached their end of life but included no alteration to the building fabric.