Restoration Begins on St Andrews Wesley Church

One of Vancouver’s most prominent landmark churches and music venue will undergo a major seismic upgrade and heritage restoration.

Design practice Ryder Architecture has been retained with RJC Engineers who will provide seismic engineering, building envelope engineering and act as prime consultant on this significant two year project.  Heatherbrae Construction are providing Construction Management services. 

St Andrews Wesley United Church stands as a stunning example of the height of Gothic Revival architecture.  Known for its glorious interior including vaulted timber roof, impressive French and Italian stained glass windows and angel reliefs, St Andrews functions as a major religious, heritage and cultural focal point for the City of Vancouver.

Located at the corner of Burrard and Nelson Streets, the church was designed and constructed between 1930 and 1933 by architects Twizell and Twizell.  Brothers George and Robert Twizell were born in Newcastle upon Tyne, in the northern English county of Northumberland before establishing themselves in Montreal in 1901.  Ryder follow a similar heritage line, being established in Newcastle upon Tyne in 1953 with the practice adding a team in Vancouver in 2016, led by principals Adam James and Warren Schmidt.

 

Ryder Architecture news

 

Originally from Newcastle before moving to Canada in 2006, principal Adam James said, “St Andrews is a special and historic place not only for the church congregation but also the City of Vancouver.  The congregation are to be commended for pursuing this project to bring the church up to current seismic safety standards. In doing so the original architecture of Twizell and Twizell will be reinvigorated to provide a home to the congregation for the next 100 years.”

The project will provide a seismic upgrade to the original concrete structure and at the same time reinstate the original plaster interiors, along with a new stone floor, pews and upgraded building services.  The heritage designated building exterior will receive a new copper roof and granite façades will be repointed and restrained.

The building is set to reopen in autumn 2020.

Ryder Architecture news Ryder Architecture news

Related News

BIM Academy in Vancouver

In June, BIM Academy’s Graham Kelly visited Vancouver to meet Adam James and Warren Schmidt who form part of Ryder’s Canadian team