Grangemouth Biomass
ClientSilva Renewable Energy Ltd
LocationGrangemouth
Project TypeInfrastructure
CompletionMay 2016
Value£300m
The site was previously used to store containers. The design has been inspired by this structure.
The plant is conceived as a series of containers stacked to orientate the higher elements of the plant away from the town to the south.
A semi translucent sculptural form encloses the highest elements, reading as part of a sequence of infrastructure set pieces in the area including the Falkirk Wheel and the Kelpie Boat Lift.